PV = Photovoltaic
You must log in or register to comment.
That’s not much of a pilot. I run 43kW at my house.
The capacity limit of the system is not the objective of the pilot project.
It cost 600k euros
PV = Photovoltaic
That’s not much of a pilot. I run 43kW at my house.
The capacity limit of the system is not the objective of the pilot project.
It cost 600k euros