You must log in or register to comment.
Open pit is much more common for this type of equipment and it’s basically a reverse mountain. Still might be enough regenerative braking from just the weight of the truck though.
Still might be enough regenerative braking from just the weight of the truck though.
In that case no, because it’d be bringing the weight of the truck and the ore with it.
An open pit at an elevation of 1.5km still means the bottom of the pit could be 1km higher than the place the ore is processed at